INDUSTRIAL VASTU — CONSULTANCY PACKAGES

SPECIALISED VASTU SOLUTIONS FOR INDUSTRIAL, MANUFACTURING, WAREHOUSING & BUSINESS FACILITIES

CHOOSE THE RIGHT LEVEL OF INDUSTRIAL VASTU SUPPORT FOR YOUR PROJECT

Our Industrial Vastu services are structured according to the stage, size and requirement of the industrial project.

SITE → DESIGN → LAYOUT → MACHINERY → OPERATIONS → EXPANSION


PACKAGE 01 — INDUSTRIAL SITE SELECTION

FOR THOSE PLANNING TO PURCHASE OR LEASE AN INDUSTRIAL SITE

IDEAL FOR:
New factories • Manufacturing units • Industrial sheds • Warehouses • Processing units

INCLUDES

  • Plot orientation assessment
  • Plot shape & proportion
  • Road and approach analysis
  • Main access / gate possibilities
  • Surrounding environment
  • Slope & level considerations
  • Broad directional zoning
  • Preliminary industrial suitability
  • Comparison of shortlisted sites
  • Site-selection recommendations

DELIVERABLE

SITE SUITABILITY REPORT

BEST FOR

“WHICH INDUSTRIAL SITE SHOULD WE SELECT?”


PACKAGE 02 — INDUSTRIAL MASTER PLAN & LAYOUT

FOR NEW INDUSTRIAL PROJECTS BEFORE CONSTRUCTION

IDEAL FOR:
Factories • Manufacturing plants • Industrial campuses • Large warehouses

INCLUDES

  • Site orientation
  • Building placement
  • Functional zoning
  • Main entrance & gates
  • Production areas
  • Raw-material storage
  • Finished-goods storage
  • Administration
  • Management areas
  • Utilities
  • Parking
  • Open spaces
  • Internal movement
  • Expansion possibilities

DELIVERABLE

INDUSTRIAL VASTU MASTER-PLAN ASSESSMENT

BEST FOR

“HOW SHOULD WE PLAN THE INDUSTRIAL SITE BEFORE CONSTRUCTION?”


PACKAGE 03 — FACTORY LAYOUT & MACHINERY

FOR MANUFACTURING & PRODUCTION FACILITIES

IDEAL FOR:
Existing factories • New production units • Engineering plants • Processing facilities

INCLUDES

  • Production-zone assessment
  • Machinery placement
  • Heavy-equipment positioning
  • Furnace / boiler / generator zones
  • Electrical equipment
  • Raw-material movement
  • Production flow
  • Finished-goods movement
  • Maintenance areas
  • Worker movement
  • Functional zoning

DELIVERABLE

MACHINERY & PRODUCTION-FLOW VASTU REPORT

BEST FOR

“IS OUR FACTORY LAYOUT SUPPORTING THE INTENDED INDUSTRIAL FUNCTION?”


PACKAGE 04 — EXISTING FACTORY VASTU AUDIT

FOR OPERATIONAL INDUSTRIAL UNITS

IDEAL FOR:
Existing factories • Plants • Workshops • Industrial premises

INCLUDES

  • Complete site review
  • Building orientation
  • Entrance & gate analysis
  • Departmental zoning
  • Machinery placement
  • Storage
  • Production movement
  • Management areas
  • Utilities
  • Water zones
  • Fire/heat zones
  • Congestion & dead-space identification
  • Major Vastu concerns
  • Practical correction possibilities

DELIVERABLE

INDUSTRIAL VASTU AUDIT + PRIORITY ACTION PLAN

BEST FOR

“OUR FACTORY IS ALREADY BUILT. WHAT CAN WE IMPROVE?”


PACKAGE 05 — INDUSTRIAL VASTU CORRECTION

FOR EXISTING FACILITIES REQUIRING TARGETED IMPROVEMENT

Instead of recommending unnecessary demolition or reconstruction, this package focuses on priority-based practical corrections.

INCLUDES

  • Identification of major concerns
  • Functional rearrangement
  • Machinery repositioning where practical
  • Storage adjustments
  • Office / management-area adjustments
  • Entrance-related recommendations
  • Space-utilisation improvements
  • Directional zoning corrections
  • Priority classification

CORRECTION PRIORITY

CRITICAL → IMPORTANT → DESIRABLE → OPTIONAL

DELIVERABLE

PRIORITY-BASED VASTU CORRECTION PLAN

BEST FOR

“WHAT SHOULD WE CHANGE — AND WHAT SHOULD WE LEAVE AS IT IS?”


PACKAGE 06 — WAREHOUSE & LOGISTICS VASTU

SPECIALISED FOR STORAGE, DISTRIBUTION & LOGISTICS FACILITIES

IDEAL FOR:
Warehouses • Distribution centres • Cold storage • Logistics hubs • Godowns

INCLUDES

  • Site orientation
  • Main gate
  • Truck movement
  • Loading / unloading
  • Raw-material storage
  • Finished-goods storage
  • Inventory movement
  • Dispatch zone
  • Office placement
  • Security
  • Parking
  • Internal circulation
  • Expansion possibilities

DELIVERABLE

WAREHOUSE & LOGISTICS VASTU ASSESSMENT

BEST FOR

“HOW CAN WE PLAN SPACE FOR BETTER STORAGE & MOVEMENT?”


PACKAGE 07 — INDUSTRIAL EXPANSION & RESTRUCTURING

FOR GROWING INDUSTRIAL BUSINESSES

When an existing facility is expanding, adding machinery or restructuring departments, Vastu may be considered alongside operational requirements.

INCLUDES

  • Existing layout review
  • Proposed expansion
  • Additional machinery
  • New production areas
  • Storage expansion
  • New entrances
  • Department relocation
  • Additional utilities
  • Workforce movement
  • Future expansion zones
  • Comparison of alternative layouts

DELIVERABLE

EXPANSION & RESTRUCTURING VASTU PLAN

BEST FOR

“WE ARE EXPANDING — HOW SHOULD THE NEW SPACE BE INTEGRATED?”


PACKAGE 08 — INDUSTRIAL PROJECT — COMPLETE VASTU

END-TO-END INDUSTRIAL VASTU CONSULTANCY

FOR LARGE OR COMPLEX INDUSTRIAL PROJECTS

This is the comprehensive package covering the project from site selection through operational planning.

INCLUDES

PHASE 1 — SITE

  • Site selection
  • Plot assessment
  • Orientation
  • Access
  • Surroundings

PHASE 2 — MASTER PLAN

  • Building placement
  • Zoning
  • Entrances
  • Open spaces
  • Circulation

PHASE 3 — PRODUCTION

  • Production zones
  • Machinery
  • Raw materials
  • Finished goods
  • Material movement

PHASE 4 — ADMINISTRATION

  • Management
  • Administration
  • Accounts
  • HR
  • Meeting areas
  • Security

PHASE 5 — UTILITIES

  • Water
  • Electrical
  • Fire/heat
  • Utilities
  • Service areas

PHASE 6 — FUTURE

  • Expansion
  • Additional machinery
  • Capacity enhancement
  • Future restructuring

DELIVERABLE

COMPLETE INDUSTRIAL VASTU MASTER REPORT

BEST FOR

“WE WANT TO INTEGRATE VASTU INTO THE INDUSTRIAL PROJECT FROM THE BEGINNING.”


PACKAGE 09 — INDUSTRIAL VASTU + BUSINESS DIRECTION

FOR ENTREPRENEURS & INDUSTRIAL DECISION-MAKERS

A specialised consultation combining industrial space assessment with the broader business context.

MAY INCLUDE

  • Nature of industrial activity
  • Site suitability
  • Functional zoning
  • Business-use compatibility
  • Management area
  • Production orientation
  • Expansion potential
  • Business transition
  • Relocation considerations
  • Operational priorities

DELIVERABLE

INDUSTRIAL SPACE + BUSINESS DIRECTION REPORT

BEST FOR

“IS THIS SPACE APPROPRIATE FOR THE BUSINESS WE INTEND TO BUILD?”


QUICK PACKAGE SELECTION

PACKAGEBEST SUITED FORPRIMARY QUESTION
01. Site SelectionNew siteWhich site should we select?
02. Master PlanNew projectHow should we plan the site?
03. Factory & MachineryManufacturingHow should production space be arranged?
04. Existing Factory AuditExisting plantWhat is currently imbalanced?
05. Vastu CorrectionExisting facilityWhat should we change?
06. Warehouse & LogisticsStorage/distributionHow should storage & movement be planned?
07. Expansion & RestructuringGrowing businessHow should additional space be integrated?
08. Complete Industrial VastuLarge projectsCan the entire project be assessed?
09. Space + Business DirectionEntrepreneursIs the space aligned with the intended business?

OPTIONAL ADD-ON SERVICES

The core package can be supplemented with:

🔹 SECOND SITE COMPARISON

Compare two or more shortlisted industrial properties.

🔹 ALTERNATIVE LAYOUT COMPARISON

Evaluate alternative layout proposals.

🔹 MACHINERY-SPECIFIC REVIEW

Focused assessment of major machinery and equipment.

🔹 OFFICE & MANAGEMENT VASTU

Detailed management and administrative-space assessment.

🔹 WAREHOUSE REVIEW

Focused storage and logistics assessment.

🔹 EXPANSION REVIEW

Assessment of proposed additional construction or machinery.

🔹 FOLLOW-UP AUDIT

Review after implementation of recommended changes.

🔹 REMOTE / ONLINE CONSULTATION

Assessment based on site plans, architectural drawings, photographs, videos and measurements.


OUR INDUSTRIAL VASTU APPROACH

WE DO NOT BEGIN WITH “WHAT IS WRONG?”

WE BEGIN WITH:

WHAT IS THE BUSINESS?
↓
WHAT IS THE SITE?
↓
WHAT IS THE FUNCTION?
↓
HOW DOES MATERIAL MOVE?
↓
WHERE ARE PEOPLE WORKING?
↓
WHERE IS THE EQUIPMENT?
↓
WHAT ARE THE OPERATIONAL REQUIREMENTS?
↓
WHAT CAN VASTU PRACTICALLY CONTRIBUTE?

VASTU → FUNCTION → PRACTICALITY → PRIORITY → ACTION


IMPORTANT

Industrial Vastu recommendations should always work alongside:

ARCHITECTURE • STRUCTURAL ENGINEERING • INDUSTRIAL ENGINEERING • FIRE SAFETY • ELECTRICAL SAFETY • ENVIRONMENTAL REQUIREMENTS • FACTORY REGULATIONS • OPERATIONAL REQUIREMENTS

SAFETY & STATUTORY COMPLIANCE ALWAYS COME FIRST.

No package promises increased production, guaranteed profit, elimination of operational problems or guaranteed business success.


CHOOSE YOUR INDUSTRIAL VASTU PACKAGE

NEW SITE?

SITE SELECTION

NEW FACTORY?

MASTER PLAN

EXISTING PLANT?

VASTU AUDIT

MACHINERY & PRODUCTION?

FACTORY LAYOUT

WAREHOUSE?

LOGISTICS VASTU

EXPANSION?

EXPANSION & RESTRUCTURING

COMPLETE PROJECT?

COMPLETE INDUSTRIAL VASTU


INDUSTRIAL VASTU

SITE → SPACE → FUNCTION → FLOW → OPERATION → EXPANSION

Astromate Anupam Shukla
Astrologer & Market Technician

UNDERSTAND THE SPACE. OPTIMISE THE FUNCTION. PLAN FOR THE FUTURE.

Leave a Reply

Your email address will not be published. Required fields are marked *